From One Token to a Gigawatt

If most jobs used AI every day, the world would need hundreds of gigawatts of new data centres. Chips and capital could keep pace within a few years; grid connections are the slowest part of the build-out.

8 mininteractive

Your estimate

If 80% of the world's jobs handed whole tasks to AI, how many gigawatts of data centres would that take?

20 GW1 GW1,000 GW

How the answer is built, in four parts

Open the parts in any order. Part 1 calculates the answer to your estimate.

The answer

Grid connections are the slowest part of the build-out

The four parts cover different links in one chain. Tokens set the number of GPUs, memory sets how many people each GPU can serve, and the network sets how much paid GPU time does useful work.

Sources and assumptions: data-centre electricity, $50B per GW, kW per GPU and the three capacity estimates come from the AI build-out analysis (IEA, company filings and analyst estimates, as of 30 October 2026). World electricity (about 32,000 TWh in 2026) extends the IEA’s 2025 figure. Sector electricity, chip speeds and optics prices are rounded public estimates. Google’s token volume is from Alphabet’s Q2 2026 earnings call; the training-run failures are from Meta’s Llama 3 paper.

Model defaults: 1,500 tokens/s per GPU, peak factor 1.7, 2.4 kW per GPU, 70% load, $50B per GW, 0.21 annual capital charge.